Saturday, March 30, 2013

Gallery Of Carpet Recording - In Buford, Georgia - Owner / Engineer / Producer Brian Zieske


Spent a day in Georgia checking out the new Gallery Of Carpet Recording Studio. Room sounds great and is amazingly comfortable! Check it out







www.galleryofcarpet.com

Saturday, March 16, 2013

FX Rack Completed for T1 Studios

Oak Added - Ready for AC and the Install

Friday, March 8, 2013

Cat 5 Headphone Jacks Mounted into the Studio Mic Panels

Inputs for the Drum Booth

Inputs for the Main Studio

Thursday, February 21, 2013

Saturday, January 5, 2013

Nothing Can Beat Perfectly Roasted Chicken

6 Pound Bird - Roasted for 1 & 1/2 hours at 425 degrees

Wednesday, January 2, 2013

Finishing Touches at Tranquility One Studios

Trim completed around control room glass

Trim completed around iso-booth glass

Trim around studio to control room completed

Bass amp arrives

Tranquility One Studios Our Doors are Open - The First Session

DDA DMR 12 - 56 Input Analog Console in action

57 on Guitar in isolation booth

Front pic of the drums in main studio


Side pic of the drums in main studio

SM 7 on Vocals - scratch

Brian Zieske - Producer / Engineer - getting guitar tone

Drum inputs into the DDA console

Joel Smith - Song writer, vocals and guitar - on the new couch, back of control room


Thursday, December 13, 2012

Saturday, December 8, 2012

Console and Gobos Move In - Tranquility On Studios

Gobos Completed for The Studio

Punch block being wired for the Furman Headphone System 

Console Moves into The Control Room 

Friday, December 7, 2012

Tranquility One Studios - Construction Update

Shelf Lighting Installed along with cans for back of the Control Room

Cloud getting prepared to be hung - carpet installed

Cloud in place along with the lighting

Thursday, December 6, 2012

Another Update - Tranquility One Studios

Floor Installed in front and under console

Monday, December 3, 2012

More work on the Control Room - Tranquility One Studios


Acoustic Cloud gets built to hang over mix position


Control Room Glass Installed

Electrical completed - Dimmers and outlets installed

Treatment on the control room front wall completed